Mt. Hope Project Documents

Mount Hope is one of world's largest deposits of moly ore

Bankable Feasibility Study
Update Presentation (PDF 276KB)
Asset Tour (PDF 11.5MB)
Update to the Mt. Hope Feasibility Study (September 2008)
Estimated Project Net Present Value of $1.4 Billion (PDF 50KB)

Presentations

presentation-icon-2

Latest Presentations
All News

Mount Hope - Development History

E-mail Print PDF

Lead-zinc ores were discovered at Mount Hope in 1870, and small scale mining was carried out sporadically until the 1970s. Zinc and adjacent copper mineralization were the focus of drilling activities by Phillips Petroleum in the early 1970s and by ASARCO and Gulf ("ASARCO") in the mid 1970s which outlined further zinc mineralization. The last drill hole of this series encountered significant molybdenum mineralization at depth west of the zinc deposits. The significance of this mineralization was first recognized by ASARCO in 1976, but ASARCO was apparently unable to reach an agreement with MHMI to test this potential.

Exxon recognized molybdenum potential at Mount Hope in 1978 and acquired an option on the property from MHMI. By 1982, Exxon had completed 69 holes, which partially defined a major molybdenum deposit underlying the east flank of the Mount Hope property. Exxon conducted a +/ 25% feasibility study of the Mount Hope prospect in 1982. The Exxon study focused on an ore production rate of 27,500 tpd starting in 1985. In December of 1983, Exxon completed an optimization study, which generally involved a reduced capital and operating cost estimate based on more aggressive project parameters. An extensive environmental database of multiple assessments by consultants formed the basis of the environmental assessment and was utilized in the Exxon permitting process for their intended BLM land exchange. The Exxon feasibility study calculated a sizable molybdenum deposit. A draft EIS was completed on the project and public hearings were held in early 1985. Exxon drilled an additional 60 holes on the property between 1983 and 1988 but did not update their deposit block model with data from the post-1982 holes. Cyprus Metals Company ("Cyprus") drilled four holes on the property in 1989 and 1990 under an agreement with Exxon but apparently did not pursue the project.

Kennecott ("Kennecott") executed an agreement in 1995, which allowed them to study the prospect and, if desired, execute a purchase by April 30, 1996. Kennecott reviewed the property and data, but did not drill any new holes. Kennecott conducted the economic evaluations but did not exercise the option on the property. The property rights remained with MHMI after the Exxon and Kennecott efforts.

General Moly established an agreement with MHMI in 2004. We obtained access to previous work completed by previous parties including drill core and drill data, which we used as the basis for developing a feasibility evaluation of the Mount Hope deposit. The feasibility study conducted by seven consulting groups acting in consortium provided the basic engineering, plant design and other aspects of analysis of the Mount Hope Project. The feasibility study outlined a positive operating process, waste disposal, mine design and plan, environmental, permitting plan, operating and capital cost estimates, and other inputs to a significant feasibility study and the corresponding estimates of mineralized material reported in BFS.